Social housing case study

Havering Council Regulation 10 flat entrance door surveys

A £60k+ Regulation 10 flat entrance door survey programme for Havering Council across occupied, local-authority-owned properties. Visits were completed during 2025 and 2026 through an eight-week programme, with follow-on visits and support ongoing. FireX coordinated resident appointments, agreed out-of-hours access and arrangements for repairs following the findings.

700+flat entrance doors surveyedNamed FireX project
Map highlighting the London Borough of Havering for a multi-site flat entrance door survey programme, without individual property locations
London Borough of Havering: geographic context for the multi-site survey programme. Individual properties and completed visits are not plotted. Boundary data: ONS December 2025 (BSC), Open Government Licence v3.0.
ClientHavering Council
LocationMultiple Havering Council-owned sites, London Borough of Havering
BuildingOccupied local-authority housing
FireX work areasFlat entrance doors (FEDs) across multiple residential sites
SectorSocial housing
Project dateVisits completed during 2025 and 2026; programme ongoing
DurationEight-week programme; follow-on visits ongoing
Project value£60k+
DeliveryResident-coordinated surveys, agreed out-of-hours access and repair arrangements
Recorded quantities700+ flat entrance doors surveyed

Project requirement

The challenge.

Havering Council required Regulation 10 surveys of flat entrance doors across multiple occupied properties in its local-authority housing portfolio. Access depended on residents being available and willing to admit the survey team, so arranging visits was a significant part of delivery. The programme needed clear appointment records, communication with residents and a way to distinguish completed checks from no-access visits and defects requiring repair.

Delivery control

How the work was managed.

FireX liaised with residents to arrange and confirm appointments, coordinated access and planned agreed out-of-hours visits to help reach households unavailable during normal working hours. Visits were completed during 2025 and 2026 through an eight-week survey programme, with work continuing as further access and follow-on requirements arose. Findings were recorded against individual flat entrance doors, with incomplete visits kept separate from completed checks. Where defects required attention, FireX helped arrange repairs and associated appointments so the findings could be progressed beyond the survey report. Resident communication, repeat-access planning and reporting supported coordination across the occupied sites.

Scope of works

Scope delivered.

Resident-led appointment planning, access coordination and clear door-by-door reporting for Regulation 10 flat entrance door checks, with repair arrangements progressed from the recorded findings.

  • Regulation 10 surveys of flat entrance doors at council-owned properties
  • Resident liaison and appointment booking
  • Access coordination in occupied buildings
  • Agreed out-of-hours visits to improve access
  • Door-by-door findings and repair recommendations
  • Arranging repairs and follow-on appointments where required
  • No-access tracking and repeat-visit planning

Completion evidence

Traceable records for the completed works.

The records linked each door to its survey findings and access status. Completed checks, no-access visits and items requiring repair could therefore be reviewed separately, helping Havering Council coordinate follow-on actions and appointments. Regulation 10 checks are routine visual checks; they do not replace the fire risk assessment or any detailed investigation needed to establish a door’s suitability.

  • Door-by-door survey and inspection schedule
  • Location-linked photographic evidence
  • Recorded findings and repair recommendations
  • Resident appointment and access status
  • No-access and follow-on visit records

Programme outcome

Recorded surveys with resident access and follow-on repairs coordinated.

More than 700 flat entrance doors were surveyed within the programme, with visits completed during 2025 and 2026 and further work ongoing. The eight-week survey delivery brought together resident appointments, agreed out-of-hours access, door-by-door findings and arrangements for repairs. Keeping completed checks, no-access locations and follow-on requirements visible helped Havering Council manage the next steps across its occupied properties.

Explore FireX fire door surveys

Talk to FireX

Planning a similar programme?

Share the building type, location, asset quantities, available survey information and target programme. We’ll review the requirement and set out the practical next step.