Inspect the opening
Identify the substrate, service type, opening size, support conditions and required rating.
Tested systems, installed correctly
We install passive fire-stopping systems around building services and at compartment interfaces. Each solution is selected for the actual substrate, service, opening and required performance - not from a generic detail.
Scope
Our scope is confirmed against the property, available evidence and client requirements before work starts.
Connected building elements
A seal is part of a complete tested arrangement. The wall or floor, opening dimensions, service type, supports and required performance influence the suitable detail. Later cable, pipe or ventilation alterations can affect an existing seal, so interfaces and reinstatement responsibilities need to be agreed with the relevant trades.
Compartmentation / Fire Damper Installation, Surveys & Servicing
Third-party certification
FireX’s stated certified scope is STD 05B. Procurement teams should check the current certificate and applicable scope for each project.
Delivery process
Identify the substrate, service type, opening size, support conditions and required rating.
Match the site condition to suitable manufacturer evidence and define any enabling works.
Complete the system, label the location and capture evidence before concealment.
Handover
Records are adjusted to suit the contract and reporting platform, while retaining the information needed to understand and verify the installation.
Relevant experience
Named projects are shown where publication is permitted; other programme examples remain anonymised to protect client confidentiality.
View all project experienceApproximately 510 service penetrations completed and 38 mechanical fire dampers installed across the basement to third floor during a five-month phased programme.
Read case study 41 penetrations treatedAll 41 identified service penetrations were treated and recorded within a one-week, out-of-hours programme that helped the clinic fit-out remain on schedule.
Read case studyService coverage
Core coverage is supported from Barking. Larger projects elsewhere in the UK can be considered where the programme and supervision requirements are suitable.
View all service areasPractical guidance
Related services
Frequently asked questions
Yes. Send the survey, FRA action or specification with the property location and approximate quantities. We will identify information gaps before confirming the scope.
Records are agreed for the contract and may include asset or location references, photographs, product information, tested-detail references and completion status. Scheme certification is included only where the particular work and supporting evidence qualify within the applicable certified scope.
Yes. FireX plans access, communication, segregation, housekeeping and progress reporting around residents, staff and other building users.
Talk to FireX
Share the available survey information, approximate quantities, building location and target timescale. We’ll review the scope and respond with the next step.