Project experience

Proven across programmes, blocks and complex work areas.

Named projects are shown where publication is permitted; other examples remain anonymised to respect client and project confidentiality.

10project examplesSurvey, installation and remedial delivery

Selected client experience

Experience across local government, housing, construction and commercial property. Logos are shown for identification only and do not imply endorsement.

Browse case studies

Values are the figures or minimum values reported in each case study. Unpublished values and locations are marked “Not disclosed”.

Showing 10 of 10 case studies.

Camden Town Hall stone façade and entrance lettering on Judd StreetCASE STUDY 01510penetrations treated

Public building

Passive fire protection at Camden Town Hall

A £250,000+ passive fire protection programme delivered over five months during the refurbishment of Camden Town Hall, comprising fire stopping to approximately 510 service penetrations, FIREFLY fire barriers and the installation of 38 mechanical fire dampers.

Location: Camden, London
Reported value: £250,000+

Fire stoppingFire barriersFire dampers
Read case study

Delivery focus

Approximately 510 service penetrations completed and 38 mechanical fire dampers installed across the basement to third floor during a five-month phased programme.

Reception at SEON Vision’s completed Kingston upon Thames eye clinicCASE STUDY 0241penetrations treated

Healthcare

Fire stopping at SEON Vision Kingston Eye Clinic

A £15,000+ fire-stopping remedial programme completed within one week at SEON Vision’s new Kingston eye clinic. FireX treated and recorded 41 service penetrations at the compartment line separating the ground-floor commercial unit from the residential accommodation above.

Location: Kingston upon Thames, London
Reported value: £15,000+

Fire stoppingHealthcareOut-of-hours delivery
Read case study

Delivery focus

All 41 identified service penetrations were treated and recorded within a one-week, out-of-hours programme that helped the clinic fit-out remain on schedule.

Exterior of Booth House on Whitechapel Road in LondonCASE STUDY 032,500+penetrations treated

Occupied hostel

Passive fire protection at Booth House, Whitechapel

A £500,000+ passive fire protection programme delivered over six months in controlled phases throughout an occupied Whitechapel hostel housing more than 200 residents. FireX coordinated intrusive surveying, fire stopping, fire damper servicing, rated ceilings, access panels and fire door works while maintaining safe occupation.

Location: Whitechapel, London
Reported value: £500,000+

Occupied buildingComplex remediationPhased works
Read case study

Delivery focus

A six-month, multi-service programme covering more than 2,500 penetrations, 92 fire dampers, over 1,000 m² of rated ceilings and extensive fire door works in an occupied building.

Exterior of The Lanesborough Hotel at Hyde Park Corner, LondonCASE STUDY 042023working with the hotel since

Hotel & leisure

Ongoing passive fire maintenance at The Lanesborough Hotel

FireX has worked directly with The Lanesborough Hotel since 2023, delivering an ongoing £100,000+ programme of annual fire damper servicing, service penetration sealing, fire door installation and maintenance while the five-star London hotel remains in operation.

Location: Hyde Park Corner, London
Reported value: £100,000+ to date

Annual servicingFire stoppingFire doors
Read case study

Delivery focus

Recurring fire damper servicing and targeted fire-stopping, fire door installation and maintenance works, with completion records for each completed scope within an ongoing hotel maintenance programme.

Exterior of Louise House student accommodation at the corner of Medway Street and Arneway Street in Westminster, LondonCASE STUDY 0579doors: 72 repaired and seven replaced

Student accommodation

Fire door remediation at Louise House, Westminster

A £75,000+ fire door and FRA remedial programme for SAV Group at Louise House, a 112-room, seven-storey student accommodation building in Westminster. The six-week programme was completed in November 2024 while the building remained occupied, with 72 communal and fire exit doors repaired and seven replaced, alongside room-door surveys and phased follow-on planning.

Location: Westminster, London
Reported value: £75,000+

Fire doorsOccupied buildingFRA action coordinationPhased planning
Read case study

Delivery focus

A six-week programme in an occupied student building: 72 communal and fire exit doors repaired, seven replaced, a separate phased plan for room doors, and coordinated survey, works and FRA records.

Exterior of Will Perrin Court sheltered housing hostel on Guysfield Drive in Rainham, with the entrance and front parking areaCASE STUDY 0632doors replaced across riser, cross-corridor and communal locations

Sheltered housing hostel

Fire door upgrades at Will Perrin Court, Rainham

A £75,000+ client-led door upgrade programme for Havering Council at Will Perrin Court, a sheltered housing hostel in Rainham. FireX replaced four riser doors, 16 cross-corridor doors and 12 communal doors over three weeks while the property remained occupied, alongside electrical-riser fire stopping and an office door entry system.

Location: Rainham, Havering, London
Reported value: £75,000+

Fire door installationOccupied buildingSheltered housing
Read case study

Delivery focus

Thirty-two replacement doors delivered over three weeks in an occupied sheltered housing hostel, with floor levelling at cross-corridor openings, electrical-riser fire stopping and coordination around residents and escape routes.

Regional map highlighting Hampshire, West Sussex and East Sussex as Saxon Weald operating regions, without individual property or FireX work locationsCASE STUDY 073,000+FRA actions completed during 2025 - 2026

Housing association programme

Ongoing FRA remedial works for Saxon Weald

An ongoing £1m+ programme of FRA remedial works, fire door upgrades and fire stopping for Saxon Weald. FireX completed more than 3,000 actions during 2025 - 2026 across occupied properties, combining follow-up surveys, approved remedial works and reactive fire door repairs within a multi-year working relationship.

Location: Multi-site housing programme
Reported value: £1m+

FRA remedialsOccupied propertiesOngoing programme
Read case study

Delivery focus

Survey-led and approved remedial works coordinated with fire safety teams, scheme managers and residents, with separate records for nominal-door repairs and certified installations.

Map highlighting the London Borough of Havering for a multi-site flat entrance door survey programme, without individual property locationsCASE STUDY 08700+flat entrance doors surveyed

Social housing

Havering Council Regulation 10 flat entrance door surveys

A £60k+ Regulation 10 flat entrance door survey programme for Havering Council across occupied, local-authority-owned properties. Visits were completed during 2025 and 2026 through an eight-week programme, with follow-on visits and support ongoing. FireX coordinated resident appointments, agreed out-of-hours access and arrangements for repairs following the findings.

Location: Havering, London
Reported value: £60k+

Regulation 10Flat entrance doorsResident liaison
Read case study

Delivery focus

Resident-led appointment planning, access coordination and clear door-by-door reporting for Regulation 10 flat entrance door checks, with repair arrangements progressed from the recorded findings.

CASE STUDY 093work areas coordinated

Public building

Complex passive fire remediation

Phased fire-stopping and compartmentation works within a live civic building, including congested service zones, controlled opening-up and evidence-led close-out.

Location: Not disclosed
Reported value: Not disclosed

Fire stoppingCompartmentationPhased works
Read case study

Delivery focus

Safe sequencing around live building use, multiple trades and concealed fire compartment lines.

CASE STUDY 10550door locations

Residential programme

Large-scale fire door remedial delivery

Survey-led repairs and replacements coordinated around resident access, repeat appointments and client reporting requirements across multiple housing blocks.

Location: Not disclosed
Reported value: Not disclosed

Fire doorsResident liaisonProgramme delivery
Read case study

Delivery focus

High-volume programme control, resident communication and transparent status reporting.

“Our aim is simple: make each completed action easy to identify, easy to verify and ready for the client’s records.”

FireX delivery principle

Talk to FireX

Need a contractor for a multi-site programme?