Plan the survey
Agree the asset list, inspection depth, access arrangements and required reporting format.
Clear, usable findings
Our surveys turn individual door defects into an actionable programme. Findings are recorded consistently, prioritised by risk and presented in a format that can support budgeting, access planning and remedial delivery.
Scope
Our scope is confirmed against the property, available evidence and client requirements before work starts.
Connected building elements
The agreed inspection considers the frame, clearances, seals, hardware, glazing and operation, together with visible surrounding interfaces. Routine visual checks and a detailed condition survey have different scopes. Concealed construction or unsupported product information is identified as a limitation rather than assumed to be satisfactory.
Delivery process
Agree the asset list, inspection depth, access arrangements and required reporting format.
Record condition, gaps, seals, hardware, glazing, signage, damage and operation.
Separate immediate risks, repairable defects and doorsets requiring further evidence or replacement.
Handover
Records are adjusted to suit the contract and reporting platform, while retaining the information needed to understand and verify the installation.
Relevant experience
Named projects are shown where publication is permitted; other programme examples remain anonymised to protect client confidentiality.
View all project experienceA six-month, multi-service programme covering more than 2,500 penetrations, 92 fire dampers, over 1,000 m² of rated ceilings and extensive fire door works in an occupied building.
Read case study 79 doors: 72 repaired and seven replacedA six-week programme in an occupied student building: 72 communal and fire exit doors repaired, seven replaced, a separate phased plan for room doors, and coordinated survey, works and FRA records.
Read case studyService coverage
Core coverage is supported from Barking. Larger projects elsewhere in the UK can be considered where the programme and supervision requirements are suitable.
View all service areasPractical guidance
Related services
Frequently asked questions
Yes. Send the survey, FRA action or specification with the property location and approximate quantities. We will identify information gaps before confirming the scope.
Records are agreed for the contract and may include asset or location references, photographs, product information, tested-detail references and completion status. Scheme certification is included only where the particular work and supporting evidence qualify within the applicable certified scope.
Yes. FireX plans access, communication, segregation, housekeeping and progress reporting around residents, staff and other building users.
Talk to FireX