Building a passive-fire golden thread

A useful passive fire record lets a future reviewer understand the defect, agreed solution, installed system and final condition. This guide sets out a practical handover checklist. For buildings subject to England's statutory golden-thread requirements, these contractor records contribute to the wider building information managed by the relevant dutyholders; they do not constitute the whole golden thread.

3minute guidePublished 7 September 2026
Updated 9 October 2026
01

Understand the statutory scope

In England, the golden-thread duties apply to defined higher-risk building projects and high-rise residential buildings, with responsibilities allocated to the relevant client, designers, contractors and accountable persons. The information covers more than passive fire installation records. Use the current official guidance to establish the requirements and dutyholders for the particular building. The record-keeping principles below are also useful on other projects, without suggesting that every building has identical statutory obligations.

  • Confirm whether the statutory regime applies to the building and work
  • Identify who maintains the building information
  • Agree how contractor evidence will enter the wider record
02

Before work starts

Capture the asset or location, existing construction, required performance, defect and agreed solution.

  • Drawings or location references
  • Survey photographs
  • Fire strategy or rating requirement
  • Approved product and tested detail
  • Design queries and exceptions
03

During installation

Photographs and checks taken before concealment are often the only lasting evidence of critical components.

  • Substrate and opening preparation
  • Fixings, supports and backing materials
  • System depth, overlaps and annular gaps
  • Installer and date
  • Inspection hold points
04

At handover

Close the loop by linking completion records to the original action and documenting anything unresolved.

  • Final status by asset
  • Before, during and after photographs
  • Product and test references
  • Certificates and inspection records
  • Access failures, departures and residual actions
05

A practical evidence-pack checklist

Agree the pack before mobilisation, then check it against the completed scope rather than accepting an unstructured collection of files. Use consistent asset or location references across plans, photographs and records. Distinguish scheme certificates from worksheets, service results and product documents, and describe their actual scope. Do not substitute a contractor's company certificate for the record of an individual repair or installation.

  • Project name, address, work scope, dates and contractor details
  • Asset register or marked-up plan with consistent location references
  • Original findings, agreed scope and authorised changes
  • Installed product, system detail and relevant evidence reference
  • Location-linked photographs, including stages before concealment where applicable
  • Inspection or test results and the final recorded condition
  • Applicable installation or maintenance certificates, worksheets or service records
  • Outstanding items, access failures, exclusions and technical queries
  • Named recipients and confirmation of handover
06

Make the information usable after handover

Set out a file index and naming convention that the receiving team can maintain. Check that the recipient can open the files, find a location and match the record to the asset. Where the statutory regime applies, follow its requirements for digital storage, security, authorised access and version control. Keep subsequent repairs and alterations linked to the same references so earlier evidence is not mistaken for the current condition.

  • Indexed files and a consistent naming convention
  • Recipient can locate and open the information
  • Current records distinguished from superseded versions
  • Future alterations linked to the original asset