Open and investigate
Confirm the cavity, supporting construction, dimensions, fixing zones and obstructions.
Concealed protection verified
Hidden cavities and voids can allow smoke and fire to bypass visible compartment lines. We inspect the actual construction, confirm a suitable tested system and record the completed barrier before it is concealed.
Scope
Our scope is confirmed against the property, available evidence and client requirements before work starts.
Connected building elements
A barrier’s edges and connections matter as much as its visible face. Supports, joints, overlaps, obstructions and service interfaces must suit the selected system and actual construction. We coordinate inspection before closure so these details can be recorded while accessible.
Delivery process
Confirm the cavity, supporting construction, dimensions, fixing zones and obstructions.
Select a compatible tested barrier arrangement and resolve interfaces before installation.
Record supports, overlaps, joints, penetrations and labels while the work remains visible.
Handover
Records are adjusted to suit the contract and reporting platform, while retaining the information needed to understand and verify the installation.
Relevant experience
Named projects are shown where publication is permitted; other programme examples remain anonymised to protect client confidentiality.
View all project experienceApproximately 510 service penetrations completed and 38 mechanical fire dampers installed across the basement to third floor during a five-month phased programme.
Read case study 3 work areas coordinatedSafe sequencing around live building use, multiple trades and concealed fire compartment lines.
Read case studyService coverage
Core coverage is supported from Barking. Larger projects elsewhere in the UK can be considered where the programme and supervision requirements are suitable.
View all service areasRelated services
Frequently asked questions
Yes. Send the survey, FRA action or specification with the property location and approximate quantities. We will identify information gaps before confirming the scope.
Records are agreed for the contract and may include asset or location references, photographs, product information, tested-detail references and completion status. Scheme certification is included only where the particular work and supporting evidence qualify within the applicable certified scope.
Yes. FireX plans access, communication, segregation, housekeeping and progress reporting around residents, staff and other building users.
Talk to FireX
Share the available survey information, approximate quantities, building location and target timescale. We’ll review the scope and respond with the next step.